2.5 KiB
Demo Script
Open https://arhipovdan.ru/ and switch Header to Presentation Mode.
3-Minute Defense
0:00-0:25 — System Overview
Demo step: System overview.
Say: the system models the full loop: detection -> classification -> actuator command -> physical route.
Watch: engineering SVG scene, sensors, stop-gate, pushers and B/C/D routes.
0:25-0:55 — Normal Item To B
Demo step: Normal item to B.
Apply scenario, use Run suggested action or Step state.
Say: dimensions pass, roundness is below threshold, category B opens the gate and sends the item straight.
0:55-1:25 — Oversized To C
Demo step: Oversized item to C.
Say: dimensions fail first, so C has priority even before shape routing.
Watch: decision tree FAIL, ROUTE_TO_C, lower roll-cage.
1:25-1:55 — Round Object To D
Demo step: Round object to D.
Say: dimensions pass, but roundness >= 0.8, so the item goes to D for repack/shape issue.
1:55-2:25 — Fault And Safety
Demo step: Jam / fault handling or Emergency stop.
With Safe Demo ON, confirm the fault scenario intentionally.
Say: abnormal states stop conveyor motion and require Reset.
2:25-3:00 — Criteria Coverage
Demo step: Performance and synchronization, then focus criteria panel.
Say: this checklist maps every OZON criterion to scenario, component and doc evidence.
5-Minute Defense
Use all 10 demo steps:
- System overview.
- Normal item to B.
- Oversized item to C.
- Round object to D.
- Boundary dimensions.
- Low confidence fallback.
- Close items queue.
- Jam / fault handling.
- Emergency stop.
- Performance and synchronization.
For each step:
- Read
What to watch. - Apply recommended scenario.
- Use
Step stateorRun suggested action. - Point to the highlighted focus area.
- Close with the presenter phrase.
Fallback If Domain Does Not Open
- SSH to server.
- Check local frontend:
curl -I http://127.0.0.1:3100/
- Check Docker project:
docker compose -p owl -f /opt/arhipovdan/app/docker-compose.server.yml ps
- If screenshots/video are prepared later, show them while explaining the same demo steps.
What Each Screen Proves
- SVG scene proves physical route and actuator command.
- Classification panel proves why category B/C/D was selected.
- Timeline proves synchronization and step-by-step behavior.
- PID panel proves conveyor control-loop behavior.
- Event Log proves traceability.
- Criteria panel proves coverage of OZON evaluation points.