# Demo Script Open https://arhipovdan.ru/ and switch Header to `Presentation Mode`. ## 3-Minute Defense ### 0:00-0:25 — System Overview Demo step: `System overview`. Say: the system models the full loop: detection -> classification -> actuator command -> physical route. Watch: engineering SVG scene, sensors, stop-gate, pushers and B/C/D routes. ### 0:25-0:55 — Normal Item To B Demo step: `Normal item to B`. Apply scenario, use `Run suggested action` or `Step state`. Say: dimensions pass, roundness is below threshold, category B opens the gate and sends the item straight. ### 0:55-1:25 — Oversized To C Demo step: `Oversized item to C`. Say: dimensions fail first, so C has priority even before shape routing. Watch: decision tree FAIL, `ROUTE_TO_C`, lower roll-cage. ### 1:25-1:55 — Round Object To D Demo step: `Round object to D`. Say: dimensions pass, but roundness >= 0.8, so the item goes to D for repack/shape issue. ### 1:55-2:25 — Fault And Safety Demo step: `Jam / fault handling` or `Emergency stop`. With Safe Demo ON, confirm the fault scenario intentionally. Say: abnormal states stop conveyor motion and require Reset. ### 2:25-3:00 — Criteria Coverage Demo step: `Performance and synchronization`, then focus criteria panel. Say: this checklist maps every OZON criterion to scenario, component and doc evidence. ## 5-Minute Defense Use all 10 demo steps: 1. System overview. 2. Normal item to B. 3. Oversized item to C. 4. Round object to D. 5. Boundary dimensions. 6. Low confidence fallback. 7. Close items queue. 8. Jam / fault handling. 9. Emergency stop. 10. Performance and synchronization. For each step: 1. Read `What to watch`. 2. Apply recommended scenario. 3. Use `Step state` or `Run suggested action`. 4. Point to the highlighted focus area. 5. Close with the presenter phrase. ## Fallback If Domain Does Not Open 1. SSH to server. 2. Check local frontend: ```bash curl -I http://127.0.0.1:3100/ ``` 3. Check Docker project: ```bash docker compose -p owl -f /opt/arhipovdan/app/docker-compose.server.yml ps ``` 4. If screenshots/video are prepared later, show them while explaining the same demo steps. ## What Each Screen Proves - SVG scene proves physical route and actuator command. - Classification panel proves why category B/C/D was selected. - Timeline proves synchronization and step-by-step behavior. - PID panel proves conveyor control-loop behavior. - Event Log proves traceability. - Criteria panel proves coverage of OZON evaluation points.