feat: add presentation demo mode
This commit is contained in:
@@ -1,69 +1,98 @@
|
||||
# Demo Script
|
||||
|
||||
Target duration: 3-5 minutes.
|
||||
Open https://arhipovdan.ru/ and switch Header to `Presentation Mode`.
|
||||
|
||||
## 1. Open The Dashboard
|
||||
## 3-Minute Defense
|
||||
|
||||
Open https://arhipovdan.ru/.
|
||||
### 0:00-0:25 — System Overview
|
||||
|
||||
Explain that this is a 2D engineering simulation, not a decorative animation: the SVG scene shows a scaled work zone, conveyor dimensions, sensors, stop-gate, pushers and roll-cages.
|
||||
Demo step: `System overview`.
|
||||
|
||||
## 2. Normal Flow
|
||||
Say: the system models the full loop: detection -> classification -> actuator command -> physical route.
|
||||
|
||||
Select `Normal flow`, press `Start`.
|
||||
Watch: engineering SVG scene, sensors, stop-gate, pushers and B/C/D routes.
|
||||
|
||||
Explain:
|
||||
### 0:25-0:55 — Normal Item To B
|
||||
|
||||
- item enters zone A;
|
||||
- camera captures bbox;
|
||||
- laser measures height;
|
||||
- ultrasonic confirms gate position;
|
||||
- gate holds item;
|
||||
- classifier selects B/C/D;
|
||||
- route command is shown on the scene;
|
||||
- event log records the full cycle.
|
||||
Demo step: `Normal item to B`.
|
||||
|
||||
Question closed: can the system show a full sorting cycle end-to-end?
|
||||
Apply scenario, use `Run suggested action` or `Step state`.
|
||||
|
||||
## 3. Step-By-Step Decision
|
||||
Say: dimensions pass, roundness is below threshold, category B opens the gate and sends the item straight.
|
||||
|
||||
Press `Reset`, then use `Step state`.
|
||||
### 0:55-1:25 — Oversized To C
|
||||
|
||||
Explain each state in the timeline. Show that Step advances by logical state, not by arbitrary animation time.
|
||||
Demo step: `Oversized item to C`.
|
||||
|
||||
Question closed: can the jury inspect synchronization and state transitions?
|
||||
Say: dimensions fail first, so C has priority even before shape routing.
|
||||
|
||||
## 4. Oversized And Round Rules
|
||||
Watch: decision tree FAIL, `ROUTE_TO_C`, lower roll-cage.
|
||||
|
||||
Select `Oversized item`, step to classification.
|
||||
### 1:25-1:55 — Round Object To D
|
||||
|
||||
Show decision tree:
|
||||
Demo step: `Round object to D`.
|
||||
|
||||
- dimensions check fails;
|
||||
- category C selected;
|
||||
- roundness is lower priority because dimensions are checked first.
|
||||
Say: dimensions pass, but roundness >= 0.8, so the item goes to D for repack/shape issue.
|
||||
|
||||
Then select `Round object` and show D when dimensions pass and roundness >= 0.8.
|
||||
### 1:55-2:25 — Fault And Safety
|
||||
|
||||
Question closed: how is classification proved?
|
||||
Demo step: `Jam / fault handling` or `Emergency stop`.
|
||||
|
||||
## 5. Robustness Scenarios
|
||||
With Safe Demo ON, confirm the fault scenario intentionally.
|
||||
|
||||
Show `close_items`, `low_confidence`, `jam`, `emergency_stop`.
|
||||
Say: abnormal states stop conveyor motion and require Reset.
|
||||
|
||||
Explain:
|
||||
### 2:25-3:00 — Criteria Coverage
|
||||
|
||||
- close items generate spacing warning and queue length;
|
||||
- low confidence uses rule-based fallback;
|
||||
- jam enters FAULT and stops conveyor;
|
||||
- emergency stop enters EMERGENCY_STOP and requires Reset.
|
||||
Demo step: `Performance and synchronization`, then focus criteria panel.
|
||||
|
||||
Question closed: what happens outside the happy path?
|
||||
Say: this checklist maps every OZON criterion to scenario, component and doc evidence.
|
||||
|
||||
## 6. PID And Metrics
|
||||
## 5-Minute Defense
|
||||
|
||||
Point to PID panel and metrics cards.
|
||||
Use all 10 demo steps:
|
||||
|
||||
Explain that PID is simplified: actual speed approaches target in normal flow and decays toward zero in fault/emergency.
|
||||
1. System overview.
|
||||
2. Normal item to B.
|
||||
3. Oversized item to C.
|
||||
4. Round object to D.
|
||||
5. Boundary dimensions.
|
||||
6. Low confidence fallback.
|
||||
7. Close items queue.
|
||||
8. Jam / fault handling.
|
||||
9. Emergency stop.
|
||||
10. Performance and synchronization.
|
||||
|
||||
Question closed: how is conveyor control represented without overbuilding physics?
|
||||
For each step:
|
||||
|
||||
1. Read `What to watch`.
|
||||
2. Apply recommended scenario.
|
||||
3. Use `Step state` or `Run suggested action`.
|
||||
4. Point to the highlighted focus area.
|
||||
5. Close with the presenter phrase.
|
||||
|
||||
## Fallback If Domain Does Not Open
|
||||
|
||||
1. SSH to server.
|
||||
2. Check local frontend:
|
||||
|
||||
```bash
|
||||
curl -I http://127.0.0.1:3100/
|
||||
```
|
||||
|
||||
3. Check Docker project:
|
||||
|
||||
```bash
|
||||
docker compose -p owl -f /opt/arhipovdan/app/docker-compose.server.yml ps
|
||||
```
|
||||
|
||||
4. If screenshots/video are prepared later, show them while explaining the same demo steps.
|
||||
|
||||
## What Each Screen Proves
|
||||
|
||||
- SVG scene proves physical route and actuator command.
|
||||
- Classification panel proves why category B/C/D was selected.
|
||||
- Timeline proves synchronization and step-by-step behavior.
|
||||
- PID panel proves conveyor control-loop behavior.
|
||||
- Event Log proves traceability.
|
||||
- Criteria panel proves coverage of OZON evaluation points.
|
||||
|
||||
Reference in New Issue