# Jury Q&A ## 1. Why 2D, Not 3D? 2D is enough for MVP validation: it shows geometry, timing, sensor positions, routes and state transitions without spending effort on heavy rendering. ## 2. Where Is Computer Vision? The MVP uses pseudo-CV: bbox, dimensions, confidence and latency are derived from mock items. The architecture keeps CV output separate from classification, so a real CV service can replace it later. ## 3. How Is Classification Correctness Proven? The decision tree shows PASS/FAIL for dimensions and roundness, actual values, thresholds and final category. Tests cover key boundary cases. ## 4. How Are Dimensions And Circular Section Handled? Dimensions are checked first against min/max width, depth and height. If they pass, roundness is checked against threshold 0.8. ## 5. Why Does C Have Priority Over D? Oversized or undersized items are operationally unsafe for the main line and must be diverted first. Therefore dimensions check precedes roundness. ## 6. How Is Synchronization Shown? Cycle timeline shows state order, simulated timestamps, durations and status: done, active, pending or skipped. ## 7. How Does The Actuator Part Work? The stop-gate fixes the item. B opens the gate, C extends pusher C, D extends pusher D, then mechanisms return home. ## 8. What Happens On Jam? The system enters FAULT, conveyor target speed becomes 0, actual speed decays toward 0, and Reset is required. ## 9. What Happens On Low CV Confidence? A warning is logged, but the system still classifies by deterministic dimensions and roundness rules. ## 10. How To Scale This To A Real Hardware-Software System? Replace pseudo-CV with a CV service, connect PLC/robot telemetry via backend/WebSocket, persist event logs, calibrate sensor latencies and add recovery policies.